15000m³ daily processing unit JWMD96N-625 upgrading plant is designed to upgrade biogas to 95% to 99.5% CH4 to methane grid or for liquefaction.
15000m³ daily processing unit JWMD96N-625 upgrading plant is designed to upgrade biogas to 95% to 99.5% CH4 to methane grid or for liquefaction.
15000m³ daily processing unit JWMD96N-625 upgrading plant is designed to upgrade biogas to 95% to 99.5% CH4 to methane grid or for liquefaction.
15000m³ daily processing unit JWMD96N-625 upgrading plant is designed to upgrade biogas to 95% to 99.5% CH4 to methane grid or for liquefaction.
Model
JWMD96N-625

Item specifics

Separation Technology
Air Products PRISM Membrane
Working Temperature
25-55℃
Working Pressure
1-1.6Mpa
Purified Purity
90-99.5%
Methane Dew Point
-20℃-60℃
Machine Type
Standard Container
Power
0.25Kw
Membrane Separator Lifespan
80,000-12,000 Hours

Review

Description

Scopy of Supply

We supply the machine with components listed as following:
Item No.
Description
Specs
QTY
1
CH₄ Screw Compressor
185Kw-15
1
2
CH₄ Drying & Filtration
1200h/1.6-Ex
1
3
Desiccant Dryer
V-25
1
4
Coalescing Filter
C-25
1
5
Oil Vapor Filter
T-25
1
6
High Precision Filter
A-25
1
7
Carbon Filter
H-25
1
8
Membrane Separator Machine
JWMD98N-625
1
9
CH₄ Receiver Tank
C-1/16.0
2

Dimensions

The whole system consists of 2x standard container, 1 for compressor and the other for membrane separation machine.

Dimension of compressor container: L 6 x W 2.5 x H 2.95 m

Dimension of CH₄ purification machine container: L 12 x W 2.5 x H 2.95 m
PROPERTIES
UNITS
RESULTS
Maximum Biogas Flow Rate
CBM/Hr
625
Biogas Temperature
25-55℃
Biogas Pressure
mPa
1.0-1.6
Membrane Working Pressure
mPa
1.0-1.5
CH₄
%
55-75%
CO₂
%
20-45%
H₂S
PPM
20
N2
%
0.1-2.0
VOC
PPM
50
NH₃
PPM
50
Analyzer
On Line
Methane Upgrde Purity
%
90-99.5
Natural Gas Purity
%
85-99.5
Calorific Value
34-37MJ/M3
Membrane Stage
3-Stage
Nitrogen Consumption
0.2CBM/Hr
Annual Working Time
Hours
8,000
Membrane Lifespan
Years
10-15